Operator Saves 10 Hours and Reduces Operational Risks by 30% During PT Gradient Survey
已发表: 12/31/2014

Operator Saves 10 Hours and Reduces Operational Risks by 30% During PT Gradient Survey
已发表: 12/31/2014


A single LIVE services unit performed all operations, reducing footprint, saving 10 hours, decreasing operational time and reducing work-hour exposure by 30% for more efficient operations.
地点
Italy, Europe
Details
Onshore Gas Field
Lithology
Sandstone
Well depth
4,987 ft [1,520 m]
Bottomhole pressure
1,892 psi [13 MPa]
Bottomhole temperature
120 degF [49 degC]
背景
Working onshore in southern Italy, an operator sought a static gradient, drawdown and shut-in pressures, and a temperature survey for each of four producing zones in a dual-completion well—all while keeping a low footprint and reducing logistics costs.