科技论文

Dual String Barrier Evaluation in a Mature Gas Storage Well: Closing Cement Data Gaps Before Sidetrack

已发表: 11/24/2026

Premium

Mature gas-storage wells often require major intervention activities despite incomplete knowledge of the retained well architecture and barrier conditions. Historical cement-evaluation records are frequently unavailable, and direct assessment of outer annuli can be restricted by the presence of multiple casing strings. This paper presents an integrated well-integrity evaluation conducted to reduce these uncertainties and support abandonment and sidetrack planning in a mature gas-storage well.

The evaluated well was scheduled for a workover programme involving removal of the original completion, permanent abandonment of the lower section of the borehole, and drilling of a sidetrack into the storage interval. The retained 7-in. production casing was required for the planned operation; however, no historical cement-evaluation data were available for either the 7-in. production casing or the 9 5/8-in. intermediate casing, and no recent corrosion assessment was available for the inner casing. Consequently, confirmation of casing condition and barrier integrity was required before execution of the planned intervention.

An integrated logging programme combined multimodality ultrasonic imaging, deep-array multimode sonic measurements, and an independent 56-finger caliper survey. The ultrasonic and multifinger measurements were used to evaluate casing geometry, remaining wall thickness, and internal condition. Acoustic impedance, conventional CBL/VDL measurements, flexural-wave attenuation, and Third Interface Echo (TIE) responses were used to characterize the material and geometry surrounding the 7-in. casing. Low-frequency orthogonal dipole dispersion analysis provided independent bond assessments for both the first and second annuli, enabling evaluation of annular isolation behind the 7-in. and 9 5/8-in. casing strings while the inner casing remained in place. TIE processing additionally provided annular acoustic velocity and pipe-to-pipe standoff information, while formation compressional and shear-wave properties were extracted from the sonic dataset where reliable separation from casing modes was possible.

The measurements confirmed that the 7-in. casing remained suitable for the planned sidetrack operation, with no significant metal loss or deformation identified. The interpreted cement top behind the 7-in. casing was consistent with historical records and supported by ultrasonic, CBL/VDL, and dipole responses. Within the planned sidetrack interval, conventional sonic and dipole measurements indicated good cement bonding, whereas high-frequency ultrasonic responses suggested poor casing-to-cement coupling consistent with a dry microannulus. Integration of the complementary measurements demonstrated the presence of cement behind the casing despite localized interfacial debonding.

The second-annulus evaluation indicated cement extending to surface and generally effective isolation behind the 9 5/8-in. casing, resolving a significant uncertainty associated with the absence of historical cement-evaluation data. Beyond barrier assessment, the integrated dataset provided casing-condition information, annular-fluid characterization, casing-position measurements, and formation acoustic properties relevant to intervention planning.

The case demonstrates how a single integrated evaluation programme can simultaneously characterize casing integrity, annular barriers, and formation properties in mature wells. The workflow reduced uncertainty before abandonment and sidetrack operations and delivered a broader well-integrity assessment without requiring removal of the inner casing.