Rapid TAML 5 multilateral junction Y-block system
For reliable, pressure-isolated dual-tubing completions with Rapid multilateral junction systems
Casing sizes
9 5/8 in
Pressure rating
5,000 psi [34.5 MPa]
Applications
- Dual-tubing completions requiring up to 5,000-psi pressure isolation for secure separation of main and lateral bores
- Multilateral wells requiring TAML 5 configurations
- New well developments and retrofit multilaterals where independent lateral control is critical
- Extended-reach or high-angle multilateral wells requiring intelligent completion integration
Benefits
- Dual-tubing flexibility: Supports independent production, injection, or monitoring in each lateral to maximize completion design options
- Intelligent completion ready: Fully compatible with hydraulic, electrohydraulic, and in-lateral Electris™ completion systems for enhanced inflow control
- Intervention access: Enables selective lateral interventions for stimulation, cleanouts, or diagnostics without disturbing the main completion
- Operational efficiency: Installs easily with standard completion systems, simplifying logistics and minimizing rig time during multilateral installation
Features
- Accommodates 3.5-in [88.9-mm] dual tubing strings with 2.992-in [76-mm] ID for optimized flow capacity
- Enables thru-tubing access to individual laterals via the selective lateral intervention completion (SLIC) system for postcompletion interventions
- Supports up to four control lines for intelligent valve operation and monitoring
- Reduces inventory complexity and simplifies field configuration because it is designed as an accessory to Rapid multilateral junction systems
How it improves performance
The Rapid™ TAML 5 multilateral junction Y-block system enables full pressure isolation and dual-tubing completion flexibility within Rapid multilateral junction systems. Designed for high-integrity, large-bore multilaterals, it simplifies installation while providing the pressure reliability, selective intervention access, and intelligent completion compatibility required for complex multilateral operations.
Completion engineers require dependable junction integrity and control flexibility in multilaterals where reservoir conditions vary. The Rapid Y-block system provides a proven, 5,000-psi isolation capability in dual-tubing configurations—supporting efficient completion of both new and retrofit wells within the junction architecture. Its robust design integrates seamlessly with standard completion systems, enabling efficient installation while maintaining main-bore production flow and pressure separation.