ESP system triples run life and earns$4.7 million
Operator extends artificial lift reliability in harsh unconventional well
A Delaware Basin operator needed to improve electric submersible pump (ESP) run life after competitor systems averaged only four to five months in harsh well conditions. A custom ESP system with an Affirmed PowerFit™ ESP small-diameter motor tripled the previous run life, generated $4.7 million* in revenue, and avoided $240,000** in workover costs.
Increase run life while managing gas interference
The Delaware Basin is a harsh environment that poses even greater challenges for ESPs, including higher gas interference and lower reservoir pressure than typical unconventional wells. After several competitor ESP failures, the operator wanted to achieve 683 bbl/d of fluid production, increase ESP run life, and keep bottomhole gas production below 340 Mcf/d.
430 days of run life with no gas-associated shutdowns
SLB designed a custom ESP system with the Affirmed PowerFit motor for small-diameter unconventional wells. The system increased gas-handling capacity to avoid gas locking and withstand harsh well conditions.
The unit operated for 430 days with no gas-associated shutdowns. During that run life, it averaged 115 bbl/d of oil, generating $4.7 million* in revenue.
Three avoided shutdowns reduce intervention cost and risk
By preventing three shutdowns, the customer avoided $240,000** in estimated workover costs. The ESP system also reduced service calls and minimized wellsite troubleshooting, helping lower wellsite safety exposure.
Gas production optimized below target threshold
The ESP system optimized gas production, averaging 251 Mcf/d compared with the previous system’s 340 Mcf/d. The improved gas-handling design helped the operator stabilize production while extending run life in a challenging unconventional environment.
*Based on $94.90 barrel of oil – 2022 average from WTI**Based on internal estimated workover costs