Integrated MPD solution enables successful deepwater drilling in the East Mediterranean
By integrating MPD and dynamic pore pressure tests (DPPTs), an East Mediterranean deepwater project avoided the need for an 11 3/4-in contingency liner and prevented wellbore losses or influxes. The approach enabled precise pressure management, allowing the well to reach TD reliably and efficiently. This success demonstrates the value of MPD and DPPT in overcoming complex subsurface challenges and optimizing drilling operations.
The East Mediterranean deepwater project faced significant drilling challenges, including high-pressure uncertainties, potential for severe losses in permeable regressed sands, and a narrow drilling window. The customer’s initial plan relied on a formation pressure while drilling (FPWD) tool, believing it would reduce pressure uncertainty with fewer complications and risks. However, concerns remained about the risk of induced influx volumes and the accuracy of pore pressure predictions, especially in low-permeability formations.
To address these uncertainties and minimize operational risks, the objective was to validate the openhole pressure profile and optimize the mud weight and equivalent circulating density (ECD) to safely drill to TD. The goal was to avoid the costly and time-consuming installation of a contingency liner, ensure secure casing and cementing operations, and maintain well integrity throughout the drilling process.
After initial reluctance, the drilling team accepted the SLB recommendation to perform a series of partial DPPTs using MPD technology, in addition to the FPWD tool. The MPD team proposed a conservative approach: small, incremental reductions in surface backpressure (SBP) and ECD, starting with a 0.1 kg/m³ reduction for short durations. This strategy allowed the team to gradually build confidence in the process while closely monitoring well response.
First DPPT:
The first test reduced ECD from 1,696 to 1,678 kg/m³ revealing well ballooning rather than influx. Based on these observations, the mud weight was further reduced from 1,642 to 1,606 kg/m³, and ECD from 1,714 to 1,666 kg/m³. Subsequent DPPTs at various depths (e.g., 1,666 to 1,654 kg/m³ at 5,410 m, 5,451 m, and 5,490 m) confirmed the well’s stability and validated the revised pore pressure predictions.
Operational Benefits:
The DPPTs enabled the team to safely lower mud weight and ECD, which was critical after severe losses were detected while drilling through the L10 sand. The ability to dynamically adjust pressure parameters prevented further losses and avoided the need for an 11 3/4-in contingency liner. The optimized pressure management also allowed for successful running and cementing of casing without losses, which would not have been possible with conventional drilling methods.
Technology Integration:
The combination of FPWD for permeable formations and MPD DPPTs for low-permeability sections provided comprehensive pressure data, allowing the subsurface team to refine their geomechanical models and make informed decisions in real time. The MPD system’s flexibility and the conservative, stepwise DPPT approach were key to educating the team and ensuring buy-in from all stakeholders.
Long-Term Impact:
The project demonstrated that MPD and DPPT technologies are essential for managing complex pressure environments in deepwater drilling. The success of this approach not only reduced operational risk and cost but also set a precedent for future wells in similar geological settings.