Tech Paper

First in the World, Slim Through Tubing Cement Evaluation for B-Annulus Section Run Through 3-1/2" Production Tubing and 9-5/8" Casing for Slot Recovery Strategy

Published: 11/23/2026

Premium

A drilling campaign was planned for Field E, involving well candidates that require extreme Extended Reach Drilling (ERD). The well design includes the cut and pull of the 9-5/8" casing to enable side-tracking from the 13-3/8" casing, followed by the drilling of two holes sections. To achieve the job objectives safely and effectively, it is essential to confirm the condition of the cement in the B-annulus section, located between the 9-5/8" and 13-3/8" casings.

Evaluating the cement condition and Top of Cement (TOC) in the B-annulus section of an oil well poses significant technical and operational challenges. Unlike the production tubing or A-annulus section, the B-annulus, located between the intermediate and outer casing, offers limited access and lack of direct diagnostic tools, making systematic evaluation of cement condition difficult.

Conventional cement bond log (CBL) tools are commonly used to evaluate cement bonding. However, these tools are typically deployed through the production tubing and are limited to assessing the cement condition in the A-annulus, which lies between the production tubing and production casing. As a result, this standard method is often unable to access and effectively evaluate the B-annulus directly. The key challenge, therefore, lies in obtaining accurate information on the cement condition in the B-annulus, as conventional CBL tools are unable to provide conclusive interpretations due to inherent tool limitations.

The challenge becomes more complex in wells with casing corrosion or poor and compromised cement isolation. In such cases, an alternative approach is required, combining the assessment of historical well data, computer modelling and even manual calculation in providing indirect diagnostics. Ultimately, the lack of reliable information on the B-annulus cement condition increases uncertainty in decision-making for future operational planning.

Another key challenge lies in the technology limitations of slim tools currently available in the market when deployed in restricted tubing sizes. An inappropriate tool selection could compromise data quality, making it more difficult to accurately evaluate cement conditions behind the larger 9-5/8" casing.

To address these challenges, an advanced logging tool must be available and deployed to acquire cement condition data in the B-annulus section. This paper discusses the deployment of an advanced slim logging tool through the 3-1/2" production tubing and 9-5/8" casing to evaluate the cement condition behind the 9-5/8" casing, as part of the slot recovery strategy.

THIS ITEM IS PREMIUM CONTENT. TO ACCESS THE FULL CONTENT, SIGN IN OR REGISTER BELOW.
Sign in or register