Tech Paper

Use of Dual-String Barrier Evaluation Technology in Plug and Abandonment Operations to Optimise Decision Making and Improve Operational Efficiency

Published: 11/23/2026

Premium

The production decline in many of the existing wells has led to a surge in the number of wells slated for abandonment in Australia. Consequently, there is a strong focus on efficient and cost-effective Plug & Abandonment (P&A) practices to optimize operations whilst also ensuring regulatory compliance.

An integral part of the P&A work scope is the evaluation of the annular barrier quality, which traditionally involves running cement evaluation services behind the single casing. However, in recent years, dual-string barrier evaluation technology has created a transformative approach to P&A operations by eliminating the need to remove the inner string prior to evaluating the barrier quality behind the outer string. By proactively conducting the dual-string barrier evaluations in a rigless manner for multiple wells designated for P&A, the new information can be utilized to optimize subsequent MODU-based activities and reduce contingencies. This innovation has the potential to significantly improve P&A efficiency whilst also lowering costs and eliminating the safety hazards of retrieving and handling the inner string. 

This paper presents several case studies where dual-string logging technology was deployed in offshore Australia during rigless P&A campaigns performed prior to MODU arrival using a lightweight offshore wireline unit. In these campaigns, the dual-string barrier evaluation technology was utilized to evaluate the axial and azimuthal material coverage in the first and second annuli concurrently as well as the barrier quality behind them. The dual-string logging services were conducted in various types of well configurations, ranging from standard 7″ × 9-5/8″ and 9-5/8″ × 13-3/8″ dual casings to the smaller 3-1/2″ × 7″ and 4-1/2″ × 9-5/8″. The measurements and observations from the dual-string logging and the impact of the log results on subsequent operations will be discussed. Finally, a validation exercise with a conventional single string barrier evaluation tool after pulling the inner string to confirm the dual-string log results will be presented.

The results from the rigless campaign resulted in a significant reduction in the barrier remediation work scope and allowed optimization of subsequent MODU based operations. Specifically, the range of contingencies planned, and remedial equipment procured was able to reduce to those which targeted the specific individual well challenges. Early access to annulus cement quality information allowed early decision making and the preparation of targeted operational program delivering P&A outcomes ahead of schedule and budget. The case studies illustrate the practical advantages of dual-string barrier evaluation technology, including enhanced barrier assessment, reduced intervention requirements, and improved operational efficiency without compromise on data quality or reliability when compared with single string options.

Ultimately, the adoption of dual-string logging technology marks a significant step forward in the pursuit of sustainable and efficient well abandonment practices in the Australian oil and gas industry.

THIS ITEM IS PREMIUM CONTENT. TO ACCESS THE FULL CONTENT, SIGN IN OR REGISTER BELOW.
Sign in or register