MPD Reduces Rig Operating Days in the Bakken
Petro-Hunt increased drilling efficiency for long laterals using an integrated alternative drilling technique.
Published: 12/01/2019
With our all-inclusive suite of customized manifolds, M-I SWACO can design application-specific configurations of chokes, gate valves, fittings, and technical specifications to give you precise pressure and flow control in any operation requiring a choke to control surface casing pressure, including managed pressure drilling (MPD) and underbalanced drilling (UBD).
Recaptcha is invalid
Please check your inbox and add the SLB email address to your safelist if needed.