PRIO achieves a 45% reduction in planning time with digital solutions | SLB

PRIO achieves a 45% reduction in planning time with digital solutions

DrillPlan
minus
Brazil

PRIO, the largest independent oil and gas company in Brazil, implemented DrillPlan™ coherent well planning and engineering solutions for well factory planning with the aim of increasing the number of wells drilled and overall production. As a result, planning time was cut by at least 45%.

At least 45% reduction in planning hours

Matheus Vieira Moreira, PRIO, well engineer

PRIO chose to implement DrillPlan solutions as the key software application driving and streamlining their well factory planning process. This has led to a reduction of at least 45% in planning hours. The key drivers of this improvement were quicker interaction with all stakeholders, robust iterations for engineering analysis, much faster comparison of alternative and/or contingent scenarios, and a solid document control structure (project version control, revision matrix), all made possible by DrillPlan solutions.

PRIO achieves a 45% reduction

PRIO chose to implement DrillPlan solutions as the key software application driving and streamlining their well factory planning process. This has led to a reduction of at least 45% in planning hours. The key drivers of this were quicker interaction with all stakeholders, robust iterations for engineering analysis, much faster comparison of alternative and/or contingent scenarios, and solid document control structure (project version control, revision matrix), all made possible by DrillPlan solutions.

Products Used