Manara
First-generation electric interval control valves
Optimize recovery and reservoir management by monitoring and controlling flow from multiple zones in real time.
Selective lateral intervention completion system
The modular selective lateral intervention completion (SLIC) system enables through-tubing intervention in multilateral wells. It can be used to access the lateral or to hydraulically isolate the lateral from the main bore.
Multiple modules can be installed for selective intervention access with a wellbore has multiple laterals.