Losseal Max HT
Lost circulation control treatment
Reduce NPT during lost circulation events by sealing large fractures at high temperatures
The Losseal Natural Fracture™ lost circulation control treatment combines engineered fibers and solids into a specially formulated pill that effectively mitigates lost circulation during drilling. The Losseal treatment leverages the synergy between fiber and solid properties to bridge fractures that could cause partial or total fluid losses. This treatment forms a strong, impermeable grid capable of withstanding increased mud density and pressure from future drilling or cementing operations.
Reduces flat drilling time
Extends well life
Reduces volume of lost mud and slurry, saving costs