Maintain proppant pack integrity in hydraulic fractures to maximize near-wellbore conductivity and oil and gas production.
Treatment Reduces ESP Failure Rate
                                Location
                            
                            
                                Indonesia, Asia, Onshore
                            
                        
                Summary
            
            
    Challenge: Scale buildup and unexpected proppant flowback account for 73% of ESP failures.
Solution: SLB designed a single stage treatment that integrates ScaleFRAC scale inhibitor service and PropNET hydraulic fracturing proppant flowback control technology.
Results: Uninterrupted production for more than 9 months after scale and proppant flowback solution.
                Objective
            
                
            
                Results
            
                
            
                    Well workover required after 3 months production prior to SLB solution. Uninterrupted production for more than 9 months after scale and proppant flowback solution.
                
        
                Products Used