- Characterization
- Drilling
- Completions
- Production
- Intervention
- Insights
- Resource Library
- Locations
- Software
Ghawar Field
Application
High-pressure positive and negative testing
Casing size
7 in
Liner size
4 1/2 in
M-I SWACO developed the WELL DOMINATOR sub tool to extend the capabilities of the WELL COMMISSIONER tool. By using the same packer for both tests, the operator was able to drill cement and test the well in a single run— completing the job in record time for monobore wells and saving 2.5 days.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup