RapidTieBack

TAML 3 or 4 conventional multilateral junction

Multilateral completion systems.

Simplify multistage stimulation and selective entry 

The RapidTieBack TAML 3 or 4 conventional multilateral junction simplifies multistage stimulation and repeatable selective entry in multilateral wells. The proven installation procedures, fully stackable system design, and high hanging capacity make it an efficient option for maximizing reservoir contact with minimal location footprint on shore or offshore.

Simple and cost-effective, the RapidTieBack multilateral junction provides a solution that is compatible with many completion options, including cemented or uncemented laterals, plug-and-perf systems, and hydraulic multistage fracturing.

The RapidTieBack junction uses the lateral locator insert (LLI) to anchor the liner and act as a depth and orientation marker. The LLI has a hanging capacity of 150,000 lbm [68,039 kg] and a torque capacity of 12,000 ft.lbf [16,270 N.m].

RapidTieBack TAML 3 or 4 conventional multilateral junction
RapidTieBack
TAML 3 or 4 conventional multilateral junction