Stimulation Optimization Using Engineered Diversion Workflow to Increase Wellbore Contact in Cemented Completions | Schlumberger
Tech Paper
Byline
C. Ohlson, K. Eisele, J. Paneitz, B. Rollins, and B. Betts, Whiting Petroleum; N. Heaton, J.R. Rondon, T.T. Do, A. Valenca, and J. Bruns, Schlumberger; S. Cleaver, Consultant
Society
SPE
Paper Number
180966
Presentation Date
2016
Products Used
Premium

Stimulation Optimization Using Engineered Diversion Workflow to Increase Wellbore Contact in Cemented Completions

Abstract

Completion techniques in the Middle Bakken formation have evolved over the years, with cemented Plug & Perf becoming the most common technique in recent years. It relies on stimulation of multiple clusters of perforations, normally 3-5, at one time. As previously demonstrated by multiple papers (SPE 173363, 144326, 167726, 174943) up to 40% of the perforation clusters remain un-stimulated. A novel engineered diversion workflow was implemented in 687 intervals of 20 Williston Basin wells. The purpose of this workflow is to increase cluster efficiency by stimulating the previously un-stimulated clusters. Results from each step down test and engineered workflow evaluation indicate increased cluster efficiency by up to 80%. Moreover, the success criteria for diversion pressure (1,000 psi) was achieved on 81% of the intervals. Due to the successfulness of these wells, this workflow has now become the standard diversion technique for one major operator in the Williston Basin.

Products Used

Share This