The use of the green completions technique in the Khazzan Field proved to be an opportunity for Schlumberger and BP Oman to collaborate on adapting a well cleanup solution to successfully reduce greenhouse gas (GHG) emissions.
As part of BP's commitment to advancing a low carbon future, BP operations around the world are striving to make a meaningful contribution to reduce GHG emissions. For BP Oman, a major GHG-emitting activity is associated with flaring in cleanup operations for new wells. For this scenario, BP Oman is taking the lead to identify and implement proactive ways of reducing GHG emissions in Khazzan Field for new well cleanups.
Supergiant Khazzan Field is characterized by tight reservoirs that require hydraulic fracturing to release the gas. After fracturing, wells are tested and cleaned up by the conventional method of flaring and burning the well fluids, which are gas and produced condensate. This results in the release of GHG to the atmosphere. To eliminate these emissions, BP Oman introduced green completions to Khazzan Field. The green completions technique redefines well testing from a GHG-producing activity to one that prevents GHG emissions by routing the hydrocarbons to the production facility.
BP Oman engaged with Schlumberger to develop a fit-for-basin solution to clean up and produce gas from Khazzan Field after fracturing. All modifications and designs were performed through the Schlumberger RapidResponse customer-driven product development process to enable solids-free produced hydrocarbons at optimal conditions for combination with the processing facility pipeline.
The residual solids from stimulation operations that are often present in the fluid flowstream pose a risk to system integrity and can compromise process lines and production facility equipment. To address this risk, Schlumberger designed and installed an integrated separation, filtration, and acoustic monitoring system for the well testing solution.
One challenge was the relatively high separating process pressure needed, which demanded a specific well test design that didn't exceed the process facility gathering system design pressure. A solution was developed by combining large-bore temporary pipelines and manifolds with a digitally enabled, high-capacity four-phase horizontal separator equipped with autonomous meters providing real-time measurements and monitoring efficient separation of the well effluent phases to deliver hydrocarbons at export specifications.
The design also enhanced process safety by incorporating 6-in safety valves in the electronic emergency shutdown system to address the high volume of hydrocarbons in the pipelines.
Schlumberger well testing solutions continue to operate at Khazzan Field and have set a new bar for operational efficiency and service delivery by improving customer performance. In 2019, the green completions well cleanup technique has been applied to 10 wells for flowback to clean up for production and reservoir testing. The result is more than 80,000 t of CO2 emission reduction. This is equivalent to taking nearly 18,000 cars off the road for a year.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup