REDA Maximus ESP System with REDA Continuum Stages Increases Run Life by 500% in the Bakken Shale | SLB

REDA Maximus ESP System with REDA Continuum Stages Increases Run Life by 500% in the Bakken Shale

Published: 05/08/2017

Concrete blue texture
Graph: REDA Maximus ESP System with REDA Continuum Stages Increases Run Life by 500% in the Bakken Shale
A Maximus system was engineered for the well with Continuum stages, fit-for-purpose motor and protector, helicoaxial MGH system, and Phoenix xt150 system with gauge. The system was preconfigured and ready for immediate installation at the wellsite, saving rig time and mitigating the risk of motor contamination or human error during equipment assembly.The system improved run life more than 500% and continued operating even as production declined to 200 bbl/d, avoiding four workovers and the associated costs of new equipment and deferred production.
Location
Bakken Formation, United States, North America, Onshore
Details

Temperature
184 degF [84.44 degC]
 
Pump setting depth
8,860 ft [2,700 m]
 
Casing size
7 in [17.8 cm]
 
Casing weight
32 lbm/ft [47.6 kg/m
 
Well depth (MD)
15,200 ft [4.63 km
 
Motor OD
4.56 in [11.58 cm]
 
Pump OD
4.00 in [10.16 cm]

Background
After multiple ESP system failures in an unconventional well, a customer needed to extend run life while improving production. With high solids content and transient flow, the environment challenged conventional ESP systems, which achieved only 20% to 40% of the expected run life.