Lithology
Soft-to-medium shale and sandstone
Section
26 in
High-risk interval
0 to 755 ft [0 to 230 m]
Drilling type
Extended reach
An operator needed to drill one remaining extended-reach well on a 32-well pad. However, drilling would pose a high risk of collision with the other wells because of its location at the center of the deck. The previously drilled wells were also in production under high-pressure conditions, so a collision could result in a serious HSE concern. To optimize drilling in the high-risk interval of the remaining well, Schlumberger designed a custom BHA.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup