Case Study: Saving Acquisition Time Shrinks Environmental Footprint | Video | Schlumberger

Case Study: Saving Acquisition Time Shrinks Environmental Footprint

Schlumberger Transition Technologies reduce CO2 emissions and drive high performance

Case Study: Saving Acquisition Time Shrinks Environmental Footprint
Optiq Seismic borehole seismic solution avoided deferred production

Watch how an operator used our Optiq Seismic fiber-optic seismic solution to avoid deferred production and reduce greenhouse gas emissions.

Optiq Seismic solution is part of our Transition Technologies portfolio of solutions that help minimize well construction CO2 footprint. These technologies enable improved operational efficiency while driving high performance sustainably.

Learn more on how to minimize well construction CO2 footprint

Read the full case study from the Gulf of Mexico.

Products Used

Share This