Product Sheet Flow Iron Fittings
Maximize total lifecycle cost savings, even in demanding fracturing, flowback, cementing, and well testing applications.
Flowback is necessary for initial well cleanup, to remove fluids that were introduced to the well and any debris that accumulated in the wellbore. The produced fluids are collected for recycling or disposal.
But beyond this necessary task, once the well has been cleaned up, well testing can be conducted. The choke pressure is managed to flow the wellstream of reservoir fluid, typically to a three-phase separator to measure the flow rate of each component: gas, oil, and produced water.
Well testing enables making key production measurements such as flow rate, fluid properties and composition, pressure, and temperature at live well conditions. From this basis you can better understand downhole conditions to
You can rely on our production testing expertise for leveraging your well test to identify improvements, increase efficiency, and focus your field investment.
Flowback and Well Testing Offerings
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup