Location
Mexico, North America, Onshore
Details
Challenge:
- Open and stimulate new intervals with minimal impact on the lower
producing interval.
- Limit deferred production and minimize risks associated with low
reservoir pressure.
- Confirm the effectiveness of the perforating sequence.
- Obtain downhole information to guide and optimize the subsequent
matrix stimulation.
Solution: Employ the following ACTive CT
real-time downhole coiled tubing services:
- ACTive OptiFIRE CT real-time selective perforating and activation
system to perforate two new intervals without the need for fluids or shutting
in the well.
- ACTive Matrix CT real-time stimulation and conformance service to
acquire live downhole measurements and optimize the stimulation treatment.
- ACTive Lift CT real-time nitrogen lifting service to improve fluid
efficiency and CT nitrogen lift operation time.
Results:
- Doubled oil production.
- Controlled water production.
- Minimized deferred production.