Western Canda
Montney Formation, Wembley Field
Operator
Canadian Natural Resources Limited
Mud
CaCl
TD
3,022 m
Canadian Natural Resources needed to drill a 3,000-m lateral while staying within the pay zone, which meant withstanding the high shock and vibration of the Montney Formation. The well plan required real-time communication with the RSS throughout the 3,022-m lateral section. Canadian Natural Resource’s standard plan was to drill the lateral in two bit runs, while struggling with sliding, equipment challenges, and lower ROPs. A BHA incorporating the xBolt G2 service was chosen to use alongside a DynaForce motor, a PowerDrive Orbit RSS, and XPC connections.
Share This
To download this file you first sign in to your Schlumberger account.
Don't have an account? Click below to get started.
Sign In Sign Up for an accountPremium content requires special account permissions. We need a little more information from you before we can grant you access.
Complete account setup