Improve well-construction performance, efficiency, and coordination while reducing wellbore instability.
Published: 11/11/2019
Published: 11/11/2019
Conventional drilling through the sloughing shale and fractured limestone of the Shuaiba Formation caused challenges in an offset well, including total losses, inefficient hole cleaning, wellbore instability, and stuck pipe with lost-in-hole BHAs. Such conditions increased NPT due to additional trips and remedial treatments with cement plugs to stabilize the wellbore, increasing the overall AFE.
The Allegro XCD-Pro service leverages a suite a software simulation solutions that help mitigate drilling risks before the BHA is run in hole. Using the DBOS drillbit optimization system, Schlumberger engineers analyzed the formation strength of this specific application to design a customized XCD casing-while-drilling alloy casing bit with a unique cutting structure that could drill the required footage in one run.
After a custom bit was designed, the i-DRILL integrated dynamic system analysis service was used to optimize a centralizer placement and generate a drilling roadmap to better control the directional profile of the well once the casing-while-drilling operation began. By drilling and casing the well at the same time, the Allegro casing- and liner-while-drilling services create a plastering effect that smears cuttings into the borehole wall, enhancing wellbore stability and drilling efficiency.
A 12 1/4-in section with 9 5/8-in casing was drilled to TD in one run without any lost-in-hole BHAs, multiple cement plugs to stabilize the wellbore, or other hole complications. As compared with the offset well, the operation reduced flat time and saved 47 rig days.
Kuwait Oil Company (KOC) used the Allegro XCD-Pro casing-while-drilling expert service to customize the drillbit design, optimize drilling parameters, and strengthen the wellbore, reaching TD in one run and saving 47 rig days as compared with an offset well.